免费智能真题库 > 历年试卷 > 软件评测师 > 2018年下半年 软件评测师 上午试卷 综合知识
  第73题      
  章/节:   专业英语       

 
The project workbook is not so much a separate document as it is a structure imposed on the documents that the project will be producing anyway.
All the documents of the project need to be part of this (71). This includes objectives ,external specifications , interface specifications , technical standards , internal specifications and administrative memoranda(备忘录).
Technical prose is almost immortal. If one examines the genealogy (手册) of a customer manual for a piece of hardware or software , one can trace not only the ideas , but also many of the very sentences and paragraphs back to the first (72) proposing the product or explaining the first design. For the technical writer, the paste-pot is as mighty as the pen.
Since this is so, and since tomorrow's product-quality manuals will grow from today’s memos, it is very important to get the structure of the documentation right. The early design of the project (73) ensures that the documentation structure itself is crafted, not haphazard. Moreover, the establishment of a structure molds later writing into segments that fit into that structure.
The second reason for the project workbook is control of the distribution of (74). The problem is not to restrict information, but to ensure that relevant information gets to all the people who need it.
The first step is to number all memoranda, so that ordered lists of titles are available and h worker can see if he has what he wants. The organization of the workbook goes well beyond this to establish a tree-structure of memoranda. The (75) allows distribution lists to be maintained by subtree, if that is desirable.
 
 
  A.  title
 
  B.  list
 
  C.  workbook
 
  D.  quality
 
 
 

 
  第71题    2015年下半年  
   82%
In a world where it seems we already have too much to do, and too many things to think about, it seems the last thing we..
  第75题    2009年上半年  
   51%
For nearly ten years, the Unified Modeling Language (UML) has been the industry standard for visualizing, specifying, co..
  第72题    2018年下半年  
   70%
The project workbook is not so much a separate document as it is a structure imposed on the documents that the project w..
   题号导航      2018年下半年 软件评测师 上午试卷 综合知识   本试卷我的完整做题情况  
1 /
2 /
3 /
4 /
5 /
6 /
7 /
8 /
9 /
10 /
11 /
12 /
13 /
14 /
15 /
 
16 /
17 /
18 /
19 /
20 /
21 /
22 /
23 /
24 /
25 /
26 /
27 /
28 /
29 /
30 /
 
31 /
32 /
33 /
34 /
35 /
36 /
37 /
38 /
39 /
40 /
41 /
42 /
43 /
44 /
45 /
 
46 /
47 /
48 /
49 /
50 /
51 /
52 /
53 /
54 /
55 /
56 /
57 /
58 /
59 /
60 /
 
61 /
62 /
63 /
64 /
65 /
66 /
67 /
68 /
69 /
70 /
71 /
72 /
73 /
74 /
75 /
 
第73题    在手机中做本题