隶属试卷 题号 题干 难度系数/错误率
   2012年上半年
   系统集成项目管..
   上午试卷 综合知识
第74题
选择题
(74) describees,indetail,the project's deliverables and the work required to create those deliverables.

75%
   2011年下半年
   系统集成项目管..
   上午试卷 综合知识
第75题
选择题
The work breakdown structure comprises several levels of decomposition of the total project. The lowest level of definition is always the(75).

58%
   2011年上半年
   系统集成项目管..
   上午试卷 综合知识
第75题
选择题
SWOT analysis is a kind of risk identification method. If the project team chose the SO strategy, they should (75).

66%
   2011年上半年
   系统集成项目管..
   上午试卷 综合知识
第74题
选择题
The earned value technique is a commonly used method of performance measurement. It integrates project scope, cost, and schedule measures to help the project management team assess project performance. If a project ’ s Schedule Performance Index(SPI=EV/PV) value less than 1.0, it means that (74).

63%
   2010年下半年
   系统集成项目管..
   上午试卷 综合知识
第75题
选择题
Plan Quality is the process of identifying quality requirements and standards for theproject and product, and documenting how the project will demonstrate compliance. (75)is a method that analyze all the costs incurred over the life of the product by investment inpreventing nonconformance to requirements, appraising the product or service forconformance to requirement, and failing to meet requir..

74%
   2010年下半年
   系统集成项目管..
   上午试卷 综合知识
第72题
选择题
Most of the host operating system provides a way for a system administrator tomanually configure the IP information needed by a host.Automated configuration methods,such as (72),are required to solve the problem.

60%
   2010年下半年
   系统集成项目管..
   上午试卷 综合知识
第71题
选择题
OSI is a theoretical model that shows how any two different systems cancommunicate with each other.Router, as a networking device, operate at the (71) layer ofthe OSI model.

56%
   2010年上半年
   系统集成项目管..
   上午试卷 综合知识
第71题
选择题
Project(71)is an uncertain event or condition that, if it occurs, has a positive or a negative effect on at least one project objective, such as time, cost, scope, or quality.  

60%
   2009年上半年
   系统集成项目管..
   上午试卷 综合知识
第73题
选择题
A project life cycle is a collection of generally sequential project (73) whose name and number are determined by the control needs of the organization or organizations involved in  the project. The life cycle provides the basic (74) for managing the project, regardless of the specific work involved.

79%
  示例说明:   选择     案例     论文        共39条     3/3页     上一页     下一页   




本网站所有产品设计(包括造型,颜色,图案,观感,文字,产品,内容),功能及其展示形式,均已受版权或产权保护。
任何公司及个人不得以任何方式复制部分或全部,违者将依法追究责任,特此声明。
本站部分内容来自互联网或由会员上传,版权归原作者所有。如有问题,请及时联系我们。


工作时间:9:00-20:00

客服

点击这里给我发消息 点击这里给我发消息 点击这里给我发消息

商务合作

点击这里给我发消息

客服邮箱service@rkpass.cn


京B2-20210865 | 京ICP备2020040059号-5 |京公网安备 11010502032051号 | 营业执照 | Copyright ©2000-2023 All Rights Reserved 软考在线版权所有