免费智能真题库 > 历年试卷 > 软件设计师 > 2011年上半年 软件设计师 上午试卷 综合知识
  第73题      
  章/节:   计算机专业英语       

 
Ravi, like many project (71) ,had studied the waterfall model of softwaredevelopment as the primary software life-cycle (72) . He was all set to use it for an upcoming project, his first assignment. However, Ravi found that the waterfall model couldnot be used because the customer wanted the software delivered in stages, something that implied that the system had to be delivered and built in (73) and not as (74) .The situation in many other projects is not very different. The real world rarely presents a problem in which a standard process, or the process used in a previous project, is the best choice. To be the most suitable, an existing process must be (75) to the new problem.A development process, even after tailoring, generally cannot handle change requests. To accommodate change requests without losing control of the project, you must supplement the development process with a requirement change management process.
 
 
  A.  parts 
 
  B.  modules
 
  C.  software
 
  D.  a whole
 
 
 

 
  第74题    2021年下半年  
   70%
One is that of a software engineer and the other is a DevOps engineer. The biggest different is in their (71). Software ..
  第71题    2012年下半年  
   68%
Computers will become more advanced and they will also become easier to use. Improved speed recognition will make the op..
  第71题    2018年下半年  
   47%
The project workbook is not so much a separate document as it is a structure imposed on the documents that the project w..
   题号导航      2011年上半年 软件设计师 上午试卷 综合知识   本试卷我的完整做题情况  
1 /
2 /
3 /
4 /
5 /
6 /
7 /
8 /
9 /
10 /
11 /
12 /
13 /
14 /
15 /
 
16 /
17 /
18 /
19 /
20 /
21 /
22 /
23 /
24 /
25 /
26 /
27 /
28 /
29 /
30 /
 
31 /
32 /
33 /
34 /
35 /
36 /
37 /
38 /
39 /
40 /
41 /
42 /
43 /
44 /
45 /
 
46 /
47 /
48 /
49 /
50 /
51 /
52 /
53 /
54 /
55 /
56 /
57 /
58 /
59 /
60 /
 
61 /
62 /
63 /
64 /
65 /
66 /
67 /
68 /
69 /
70 /
71 /
72 /
73 /
74 /
75 /
 
第73题    在手机中做本题