免费智能真题库 > 历年试卷 > 信息系统监理师 > 2014年下半年 信息系统监理师 上午试卷 综合知识
  第74题      
  章/节:   专业英语       

 
In all projects,needs must be tempered by schedule ,cost and resource constraints. Project success depends primarily on (74).
 
 
  A.  The quality of the schedule and cost control analysis
 
  B.  Customer satisfactions
 
  C.  Customer compromises in defining its needs
 
  D.  Exceeding customer requirements through gold-plating
 
 
 

 
  第75题    2018年上半年  
   62%
( )in not included in Control Quality input documents.
  第74题    2019年上半年  
   65%
The perform Integrated Change Contorl process is the ultimate responsibility of the (73).Although changes may be initi..
  第71题    2012年下半年  
   79%
In software engineering and systems engineering,(71) is a description of a system’s behavior as it responds to a r..
   题号导航      2014年下半年 信息系统监理师 上午试卷 综合知识   本试卷我的完整做题情况  
1 /
2 /
3 /
4 /
5 /
6 /
7 /
8 /
9 /
10 /
11 /
12 /
13 /
14 /
15 /
 
16 /
17 /
18 /
19 /
20 /
21 /
22 /
23 /
24 /
25 /
26 /
27 /
28 /
29 /
30 /
 
31 /
32 /
33 /
34 /
35 /
36 /
37 /
38 /
39 /
40 /
41 /
42 /
43 /
44 /
45 /
 
46 /
47 /
48 /
49 /
50 /
51 /
52 /
53 /
54 /
55 /
56 /
57 /
58 /
59 /
60 /
 
61 /
62 /
63 /
64 /
65 /
66 /
67 /
68 /
69 /
70 /
71 /
72 /
73 /
74 /
75 /
 
第74题    在手机中做本题