Ravi, like many project (71) , had studied the waterfall model of software development as the primary software life-cycle (72) . He was all set to use it for an upcoming project, his first assignment. However, Ravi found that the waterfall model could not be used because the customer wanted the software delivered in stages, something that implied that the system had to be delivered and built in (73) and not as (74) 。
The situation in many other projects is not very different. The real world rarely presents a problem in which a standard process, or the process used in a previous project, is the best choice. To be the most suitable, an existing process must be (75) to the new problem.
A development process, even after tailoring, generally cannot handle change requests. To accommodate change requests without losing control of the project, you must supplement the development process with a requirement change management process.
 
  A.  parts
 
  B.  modules
 
  C.  software
 
  D.  a whole




 
 
相关试题     计算机专业英语 

  第74题    2017年上半年  
The beauty of software is in its funciion ,in its internal srurcture,and in zhe way inwhich it is created by a team. To a user,a program with just th..

  第75题    2021年上半年  
When we talk about a database,we must differentiate between the database(71),which is the logical design of the database,and the database(72),whic..

  第74题    2019年上半年  
The entity-relationship (E-R) data model is based on a perception of a real world that consists of a collection of basic objects, called (71),and o..