Ravi, like many project (71) , had studied the waterfall model of software development as the primary software life-cycle (72) . He was all set to use it for an upcoming project, his first assignment. However, Ravi found that the waterfall model could not be used because the customer wanted the software delivered in stages, something that implied that the system had to be delivered and built in (73) and not as (74) .
The situation in many other projects is not very different. The real world rarely presents a problem in which a standard process, or the process used in a previous project, is the best choice. To be the most suitable, an existing process must be (75) to the new problem.
A development process, even after tailoring, generally cannot handle change requests. To accommodate change requests without losing control of the project, you must supplement the development process with a requirement change management process.
 
  A.  activity
 
  B.  procedure
 
  C.  process
 
  D.  progress




 
 
相关试题     专业英语 

  第73题    2011年上半年  
Ravi, like many project (71) , had studied the waterfall model of software development as the primary software life-cycle (72) . He was all set to use..

  第75题    2018年上半年  
what does the multimedia actually mean?
( 71 ), multimedia means two or more media.if the publisher of this book wanted to join the current hyp..

  第74题    2015年上半年  
Why Have Formal Documents?
First, writing the decisions down is essential. Only when one writes do the gaps appear and the (71) protrude(突出).T..




更多复习资料
请登录电脑版软考在线 www.rkpass.cn

京B2-20210865 | 京ICP备2020040059号-5
京公网安备 11010502032051号 | 营业执照
 Copyright ©2000-2026 All Rights Reserved
软考在线版权所有