2009年上半年 上午试卷 综合知识
第 71 题
章/节 专业英语  
 
 
Many of the activities performed during the preliminary investigation are still being conducted in(71), but in much greater depth than before. During this phase, the analyst must become fully aware of the(72)and must develop enough knowledge about the(73)and the existing systems to enable an effective solution to be proposed and implemented.  Besides the(74)for process and data of current system, the deliverable from this phase also includes the(75)for the proposed system.
 
  A.  analysis phase
 
  B.  design phase
 
  C.  implementation phase
 
  D.  maintenance phase




 
 
相关试题     专业英语 

  第72题    2016年下半年  
(72)is a term for data sets that are so large or complex that traditional data processing applications are inadequate. Challenges include analysis, ..

  第75题    2015年上半年  
The following diagram denotes dependency between two activities A and B,It says()
.

  第71题    2011年上半年  
Documentation of a software package is normally produced for two purposes.One is to explain the(71)of thesoftware and describe how to use them.This is..