Many of the activities performed during the preliminary investigation are still being conducted in(71), but in much greater depth than before. During this phase, the analyst must become fully aware of the(72)and must develop enough knowledge about the(73)and the existing systems to enable an effective solution to be proposed and implemented.  Besides the(74)for process and data of current system, the deliverable from this phase also includes the(75)for the proposed system.
 
  A.  analysis phase
 
  B.  design phase
 
  C.  implementation phase
 
  D.  maintenance phase




 
 
相关试题     专业英语 

  第74题    2016年上半年  
(74) is one of the tools and techniques of Sequence Activities

  第75题    2013年下半年  
The intention of the(75)is to schedule, organize and control all activities to achieve the project goal eventually.no matter how difficult it is and..

  第73题    2019年下半年  
( )is the process of managing procurement relationships , monitoring contract performance, and making changes and corrections as appropriate, and cl..