( ) are those costs that cannot be directly traced to a specific project and therefore will be accumulated and allocalted equitably over multiple projects by some approved and documented accounting procedure.
 
  A.  Direct costs
 
  B.  operation costs
 
  C.  Indirect costs
 
  D.  Implement costs




 
 
相关试题     专业英语 

  第71题    2009年上半年  
Many of the activities performed during the preliminary investigation are still being conducted in(71), but in much greater depth than before. Durin..

  第72题    2022年下半年  
()can be described by the following characteristics: volume, variety,velocity,veracity and value.?

  第75题    2017年下半年  
In project network diagram,the number of critical path is().