2011年下半年 上午试卷 综合知识
第 73 题
章/节 专业英语  
 
 
The project schedule is more than a document that lays out the activities over time to represent the time dimension of the project, it is a management tool to be used for decision making. As such , the schedule is used by the project management team to(73).
 
  A.  Measure, delay, record, distribute , analyze, and direct
 
  B.  Plan, schedule, monitor, control, report, and forecast
 
  C.  Promote, highlight, monitor, control, forecast, and report
 
  D.  Emphasize, visualize, analyze, conceptualize, report and record




 
 
相关试题     专业英语 

  第75题    2014年下半年  
The Perform Integrated Change Control process is conducted from project inception through completion and is the ultimate responsibility of the ( ).<..

  第74题    2018年上半年  
In project management and systems engineering, ( )is a deliverable-oriented breakdown of a project into smaller components. It is a key project deli..

  第73题    2017年上半年  
For any information system to serve its purpose ,the information must be( )when it ìs needed.




更多复习资料
请登录电脑版软考在线 www.rkpass.cn

京B2-20210865 | 京ICP备2020040059号-5
京公网安备 11010502032051号 | 营业执照
 Copyright ©2000-2025 All Rights Reserved
软考在线版权所有