全部科目 > 系统集成项目管理工程师 >
2011年下半年 上午试卷 综合知识
第 73 题
章/节 专业英语  
 
 
The project schedule is more than a document that lays out the activities over time to represent the time dimension of the project, it is a management tool to be used for decision making. As such , the schedule is used by the project management team to(73).
 
  A.  Measure, delay, record, distribute , analyze, and direct
 
  B.  Plan, schedule, monitor, control, report, and forecast
 
  C.  Promote, highlight, monitor, control, forecast, and report
 
  D.  Emphasize, visualize, analyze, conceptualize, report and record




 
 
相关试题     专业英语 

  第73题    2010年上半年  
(73)is the application of planned, systematic quality activities to ensure that the project will employ all processes needed to meet requirements.

  第72题    2012年上半年  
Information is no good to you if you can't (72) it.The location dimension of information means having access to access to information no where you are..

  第73题    2019年上半年  
( )is a process of developing a document that formally authorizes the existence of a project and provides the project manager with the authority to ..