全部科目 > 系统集成项目管理工程师 >
2012年下半年 上午试卷 综合知识
第 71 题
章/节 专业英语  
 
 
A test case normally consists of a unique identifier, requirement references from a design specification, events, aseries of stepsto follow, input,output, actual result, and (71).
 
  A.  bug
 
  B.  expected result
 
  C.  test report
 
  D.  traceability matrix




 
 
相关试题     专业英语 

  第71题    2011年下半年  
The project manager must maintain an effective communication link with the customer’s satisfaction with the progress of the project. The project..

  第71题    2015年上半年  
The(71)refers to the integration of complex physical machinery with networked sensors and software. It draws together fields such as machine learnin..

  第75题    2011年上半年  
SWOT analysis is a kind of risk identification method. If the project team chose the SO strategy, they should (75).




更多复习资料
请登录电脑版软考在线 www.rkpass.cn

京B2-20210865 | 京ICP备2020040059号-5
京公网安备 11010502032051号 | 营业执照
 Copyright ©2000-2026 All Rights Reserved
软考在线版权所有