第 73 题
章/节 专业英语  
 
 
() is the highest level of quality management.
 
  A.  Detect and correct the defects before the desirables are sent头the customer as of the quality control process
 
  B.  Use quality assurance to examine and correct the process it self and not just special defects
 
  C.  Incorporate quality into the ptanning and designing of the project and product
 
  D.  Createa throughout the organization that is committed to quality in process and products




 
 
相关试题     专业英语 

  第73题    2016年上半年  
In project time management, activity definition is the process of identifying and documenting the specific action to be performed to produce the proje..

  第73题    2019年上半年  
( )is a process of developing a document that formally authorizes the existence of a project and provides the project manager with the authority to ..

  第75题    2011年下半年  
The work breakdown structure comprises several levels of decomposition of the total project. The lowest level of definition is always the(75).




更多复习资料
请登录电脑版软考在线 www.rkpass.cn

京B2-20210865 | 京ICP备2020040059号-5
京公网安备 11010502032051号 | 营业执照
 Copyright ©2000-2025 All Rights Reserved
软考在线版权所有