Many of the activities performed during the preliminary investigation are still being conducted in (71).but in much greater depth than before. During this phase, the analyst must become fully aware of the(72)and must develop enough knowledge about the(73)and the existing systems to. enable an effective solution to be proposed and implemented. Besides the(74)for process and data of current system,the deliverable from this phase also includes the(75)for the proposed system.
 
  A.  formal requirements definition
 
  B.  system performance specification
 
  C.  general problem statement
 
  D.  hardware and software specification




 
 
相关试题     专业英语 

  第74题    2022年上半年  
Requirements validation is the process of checking that requirements actually define the system that the customer really wants. It overlaps with analy..

  第73题    2021年上半年  
The objective of the systems analysis phase is to understand the proposed project, ensure that it will support business requirements, and build a soli..

  第72题    2022年上半年  
Requirements validation is the process of checking that requirements actually define the system that the customer really wants. It overlaps with analy..