全部科目 > 系统分析师 >
2025年下半年 上午试卷 综合知识
第 72 题
章/节 专业英语  
 
 
The analysis phase answers the questions of who will use the system, what the system will do, and where and when it will be used. During this phase, the project team investigates any current system, identifies (71),and develops a concept for the new system. This phase has tbree steps: first, (72) is developed to guide the project team's efforts. It usually includes an analysis of the current system and its problems, and the ways to design a new system. The next step is (73) .The analysis of this information - in conjunction with input from the project sponsor and many other people - leads to the development of a concept for a new system. The system concept is then used as a basis to develop a set of business analysis models that describes how the business will operate if the new system were developed. The set of models typically includes models that represent the (74) necessary to support the underlying business process. Last, the analyses, system concepts, and models are combined into a document called the (75) , which is presented to the project sponsor and other key decision makers that decide whether the project should continue to move forward.
 
  A.  a user manual
 
  B.  a design user case
 
  C.  an analysis use case
 
  D.  an analysis strategy




 
 
相关试题     专业英语 

  第74题    2013年上半年  
Feasibility should be measured throughout the life cycle of system development. The scope and complexity of an apparently feasible project can change ..

  第75题    2022年上半年  
Requirements validation is the process of checking that requirements actually define the system that the customer really wants. It overlaps with analy..

  第75题    2014年上半年  
A requirement is simply a statement of what the system must do or what characteristics it needs to have. Requirements written from the perspective of ..




更多复习资料
请登录电脑版软考在线 www.rkpass.cn

京B2-20210865 | 京ICP备2020040059号-5
京公网安备 11010502032051号 | 营业执照
 Copyright ©2000-2025 All Rights Reserved
软考在线版权所有