Feasibility should be measured throughout the life cycle of system development. The scope and complexity of an apparently feasible project can change after the initial problems and opportunities are fully analyzed or after the system has been designed. Thus, a project that is feasible at one point may become infeasible later. The first feasibility analysis is conducted during the (71) . The (72) represents a major feasibility analysis activity since it charts one of many possible implementations as the target for systems design. (73) is a measure of how well the solution will work in the organization. It is also a measure of how people feel about the system. When it is determined in the later stages of the system life cycle, (74) is often performed with a working prototype of the proposed system. This is a test of the system’s user interfaces and is measured in how easy they are to learn and to use and how they support the desired productivity levels of the users. Economic feasibility has been defined as a cost-benefit analysis. The (75) technique is a simple and popular method for determining if and when an investment will pay for itself.
 
  A.  control analysis
 
  B.  interface analysis
 
  C.  usability analysis
 
  D.  performance analysis




 
 
相关试题     专业英语 

  第71题    2017年上半年  
The purpose of systems analysis phase is to build a logical model of the new system. The first step is71, where you investigate business processes and..

  第75题    2020年下半年  
Unified Modeling Language (UML) is a widely used method of visualizing and documenting an information system. The UML can be used to develop (71)

  第72题    2025年下半年  
The analysis phase answers the questions of who will use the system, what the system will do, and where and when it will be used. During this phase, t..