全部科目 > 系统分析师 >
2011年上半年 上午试卷 综合知识
第 73 题
章/节 专业英语  
 
 
The analysis phase answers the questions of who will use the system, what the system will do, and where and when it will be used. During this phase, the project team investigates any current system, identifies (71),and develops a concept for the new system. This phase has tbree steps: first, (72) is developed to guide the project team's efforts. It usually includes an analysis of the current system and its problems, and the ways to design a new system. The next step is (73) .The analysis of this information - in conjunction with input from the project sponsor and many other people - leads to the development of a concept for a new system. The system concept is then used as a basis to develop a set of business analysis models that describes how the business will operate if the new system were developed. The set of models typically includes models that represent the (74) necessary to support the underlying business process. Last, the analyses, system concepts, and models are combined into a document called the (75) , which is presented to the project sponsor and other key decision makers that decide whether the project should continue to move forward.
 
  A.  project scope definition
 
  B.  problems analysis
 
  C.  decision analysis
 
  D.  requirements gathering




 
 
相关试题     专业英语 

  第75题    2024年下半年  
The objective of the systems analysis phase is to understand the proposed project, ensure that it will support business requirements, and build a soli..

  第75题    2024年上半年  
uring the systems planning phase, a systems analyst conducts a (71)activity to study the systems request and recommend specific action. After obtain..

  第72题    2014年上半年  
A requirement is simply a statement of what the system must do or what characteristics it needs to have. Requirements written from the perspective of ..