第 74 题
章/节 专业英语  
 
 
Feasibility should be measured throughout the life cycle of system development. The scope and complexity of an apparently feasible project can change after the initial problems and opportunities are fully analyzed or after the system has been designed. Thus, a project that is feasible at one point may become infeasible later. The first feasibility analysis is conducted during the (71) . The (72) represents a major feasibility analysis activity since it charts one of many possible implementations as the target for systems design. (73) is a measure of how well the solution will work in the organization. It is also a measure of how people feel about the system. When it is determined in the later stages of the system life cycle, (74) is often performed with a working prototype of the proposed system. This is a test of the system’s user interfaces and is measured in how easy they are to learn and to use and how they support the desired productivity levels of the users. Economic feasibility has been defined as a cost-benefit analysis. The (75) technique is a simple and popular method for determining if and when an investment will pay for itself.
 
  A.  performance analysis
 
  B.  control analysis
 
  C.  usability analysis
 
  D.  interface analysis




 
 
相关试题     专业英语 

  第74题    2014年上半年  
A requirement is simply a statement of what the system must do or what characteristics it needs to have. Requirements written from the perspective of ..

  第75题    2026年上半年  
Feasibility should be measured throughout the life cycle of system development. The scope and complexity of an apparently feasible project can change ..

  第74题    2025年下半年  
The analysis phase answers the questions of who will use the system, what the system will do, and where and when it will be used. During this phase, t..




更多复习资料
请登录电脑版软考在线 www.rkpass.cn

京B2-20210865 | 京ICP备2020040059号-5
京公网安备 11010502032051号 | 营业执照
 Copyright ©2000-2026 All Rights Reserved
软考在线版权所有