2011年上半年 上午试卷 综合知识
第 72 题
章/节 计算机专业英语  
 
 
Ravi, like many project (71) ,had studied the waterfall model of softwaredevelopment as the primary software life-cycle (72) . He was all set to use it for an upcoming project, his first assignment. However, Ravi found that the waterfall model couldnot be used because the customer wanted the software delivered in stages, something that implied that the system had to be delivered and built in (73) and not as (74) .The situation in many other projects is not very different. The real world rarely presents a problem in which a standard process, or the process used in a previous project, is the best choice. To be the most suitable, an existing process must be (75) to the new problem.A development process, even after tailoring, generally cannot handle change requests. To accommodate change requests without losing control of the project, you must supplement the development process with a requirement change management process.
 
  A.  activity
 
  B.  procedure 
 
  C.  process
 
  D.  progress




 
 
相关试题     计算机专业英语 

  第72题    2015年下半年  
In a world where it seems we already have too much to do,and too many things to think about, it seems the last thing we need is something new that we ..

  第72题    2021年上半年  
下面是一个软件项目活动图,其中顶点表示项目里程碑,连接顶点的边表示包含的活动,边上的权重表示活动的持续时间(天),则关键路径长度为(71),在该活动图中..

  第72题    2018年上半年  
Creating a clear map of where the project is going is an important first step. It lets you identify risks, clarify objectives, and determine if the pr..