2011年上半年 上午试卷 综合知识
第 73 题
章/节 计算机专业英语  
 
 
Ravi, like many project (71) ,had studied the waterfall model of softwaredevelopment as the primary software life-cycle (72) . He was all set to use it for an upcoming project, his first assignment. However, Ravi found that the waterfall model couldnot be used because the customer wanted the software delivered in stages, something that implied that the system had to be delivered and built in (73) and not as (74) .The situation in many other projects is not very different. The real world rarely presents a problem in which a standard process, or the process used in a previous project, is the best choice. To be the most suitable, an existing process must be (75) to the new problem.A development process, even after tailoring, generally cannot handle change requests. To accommodate change requests without losing control of the project, you must supplement the development process with a requirement change management process.
 
  A.  parts 
 
  B.  modules
 
  C.  software
 
  D.  a whole




 
 
相关试题     计算机专业英语 

  第72题    2016年上半年  
In the fields of physical security and information security, access control is the selective restriction of access to a place or other resource. The a..

  第74题    2024年下半年  
Teams are required for most engineering projects. Although some small hardware or software products can be developed by individuals, the scale and com..

  第72题    2021年上半年  
下面是一个软件项目活动图,其中顶点表示项目里程碑,连接顶点的边表示包含的活动,边上的权重表示活动的持续时间(天),则关键路径长度为(71),在该活动图中..