Ravi, like many project (71) ,had studied the waterfall model of softwaredevelopment as the primary software life-cycle (72) . He was all set to use it for an upcoming project, his first assignment. However, Ravi found that the waterfall model couldnot be used because the customer wanted the software delivered in stages, something that implied that the system had to be delivered and built in (73) and not as (74) .The situation in many other projects is not very different. The real world rarely presents a problem in which a standard process, or the process used in a previous project, is the best choice. To be the most suitable, an existing process must be (75) to the new problem.A development process, even after tailoring, generally cannot handle change requests. To accommodate change requests without losing control of the project, you must supplement the development process with a requirement change management process.
 
  A.  modified 
 
  B.  used
 
  C.  suited
 
  D.  tailored




 
 
相关试题     计算机专业英语 

  第72题    2016年下半年  
Software entities are more complex for their size than perhaps any other human construct, because no two parts are alike (at least above the statement..

  第71题    2018年下半年  
The project workbook is not so much a separate document as it is a structure imposed on the documents that the project will be producing anyway.
..

  第74题    2021年下半年  
One is that of a software engineer and the other is a DevOps engineer. The biggest different is in their (71). Software engineers focus on how well th..




更多复习资料
请登录电脑版软考在线 www.rkpass.cn

京B2-20210865 | 京ICP备2020040059号-5
京公网安备 11010502032051号 | 营业执照
 Copyright ©2000-2026 All Rights Reserved
软考在线版权所有