全部科目 > 软件设计师 >
2011年上半年 上午试卷 综合知识
第 75 题
章/节 计算机专业英语  
 
 
Ravi, like many project (71) ,had studied the waterfall model of softwaredevelopment as the primary software life-cycle (72) . He was all set to use it for an upcoming project, his first assignment. However, Ravi found that the waterfall model couldnot be used because the customer wanted the software delivered in stages, something that implied that the system had to be delivered and built in (73) and not as (74) .The situation in many other projects is not very different. The real world rarely presents a problem in which a standard process, or the process used in a previous project, is the best choice. To be the most suitable, an existing process must be (75) to the new problem.A development process, even after tailoring, generally cannot handle change requests. To accommodate change requests without losing control of the project, you must supplement the development process with a requirement change management process.
 
  A.  modified 
 
  B.  used
 
  C.  suited
 
  D.  tailored




 
 
相关试题     计算机专业英语 

  第74题    2013年上半年  
So it is today. Schedule disaster,functional misfits,and systembugs all arise because the left hand doesn’t know what the right hand is doing.As..

  第72题    2025年下半年  
Why is (71) fun? What delights may its practitioner expect as his reward? First is the sheer joy of making things. As the child delights in his mud pi..

  第71题    2015年下半年  
In a world where it seems we already have too much to do,and too many things to think about, it seems the last thing we need is something new that we ..




更多复习资料
请登录电脑版软考在线 www.rkpass.cn

京B2-20210865 | 京ICP备2020040059号-5
京公网安备 11010502032051号 | 营业执照
 Copyright ©2000-2026 All Rights Reserved
软考在线版权所有