全部科目 > 信息系统监理师 >
2015年下半年 上午试卷 综合知识
第 75 题
章/节 专业英语  
 
 
A software requirements specification is that ( ).
 
  A.  a rough list of things that the proposed software ought to do
 
  B.  a precise list of things that the proposed software ought to do
 
  C.  a formal list of things that the proposed software must do
 
  D.  an estimate of the resources(time, money, personnel, etc) which will be required to construct the proposed software




 
 
相关试题     专业英语 

  第75题    2010年上半年  
(75) is not the tool name for quality controlling used in the figure below.

  第75题    2013年上半年  
Workarounds are determined during which risk management process? (75)

  第73题    2018年上半年  
( ) is not included in Perform Integrated Change Control Process.




更多复习资料
请登录电脑版软考在线 www.rkpass.cn

京B2-20210865 | 京ICP备2020040059号-5
京公网安备 11010502032051号 | 营业执照
 Copyright ©2000-2025 All Rights Reserved
软考在线版权所有