隶属试卷 题号 题干 难度系数/错误率
   2014年下半年
   信息系统项目管..
   上午试卷 综合知识
第73题
选择题
some team leaders think that the only way to (73) their team is through cash incentives. However research proves that money is the last thing you would want to use.

75%
   2014年上半年
   信息系统项目管..
   上午试卷 综合知识
第73题
选择题
Requirements management is the process of (73),analyzing,tracing,prioritizing and agreeing on requirements and then controlling changes and communicating to relevant stakeholders.It is a (74)process throughout a project.A requirement is a capability to which a project outcome (product or sevice) should conform.

83%
   2013年下半年
   信息系统项目管..
   上午试卷 综合知识
第75题
选择题
The intention of the(75)is to schedule, organize and control all activities to achieve the project goal eventually.no matter how difficult it is and what kind of risks are there.

59%
   2013年下半年
   信息系统项目管..
   上午试卷 综合知识
第73题
选择题
The uncertainty of an event is measured by its probability of occurrence and is inversely proportional to that. The more uncertain an event is. The more information is required to resolve uncertainty of that event. The amount of information is measured in (73).

61%
   2012年上半年
   信息系统项目管..
   上午试卷 综合知识
第75题
选择题
You have just taken control of a project in the middle of execution and need to learn who has approva lauthority for revisions in scope. (75) document provides this information.

58%
   2011年下半年
   信息系统项目管..
   上午试卷 综合知识
第38题
选择题
某大型项目进行到两年时,使用挣值法所需要的三个中间变量的数值分别是:计划值PV为400 万元,实际成本AC为200 万元,挣值EV为100万元。基于该项目的成本偏差,下列描述正确的是(38),基于该项目的成本绩效指数,下列描述中正确的是(39)。

25%
   2010年下半年
   信息系统项目管..
   上午试卷 综合知识
第75题
选择题
Creating WBS means subdividing the major project deliverables into smaller components until the deliverables are defined to the (75) level.

55%
   2010年下半年
   信息系统项目管..
   上午试卷 综合知识
第74题
选择题
Configuration management system can be used in defining approval levels for authorizing changes and providing a method to validate approved changes.(74) is not a project configuration management tool.

65%
   2010年下半年
   信息系统项目管..
   上午试卷 综合知识
第72题
选择题
Many useful tools and techniques are used in developing schedule. (72) is a schedule network analysis technique that modifies the project schedule to account for limited resource.

81%
   2009年上半年
   信息系统项目管..
   上午试卷 综合知识
第71题
选择题
Many of the activities performed during the preliminary investigation are still being conducted in(71), but in much greater depth than before. During this phase, the analyst must become fully aware of the(72)and must develop enough knowledge about the(73)and the existing systems to enable an effective solution to be proposed and implemented.  Besides the(74)for process and data of cur..

60%
   2008年下半年
   信息系统项目管..
   上午试卷 综合知识
第75题
选择题
Developing the project schedule is often an iterative process. It determines the planned start and finish dates for project activities and milestones. Schedule development can require the review and revision of duration estimates and resource estimates to create an approved project schedule that can serve as a baseline to (75) progress.

67%
   2008年下半年
   信息系统项目管..
   上午试卷 综合知识
第45题
选择题
某正在进行中的项目,当前的PV=2200元、EV=2000元、AC=2500元,当前项目的SV和项目状态是(45) ,该项目的CPI和成本绩效是(46) 。

36%
   2008年上半年
   信息系统项目管..
   上午试卷 综合知识
第75题
选择题
Durin the project, requirements chan e for a variety of reasons. As needs chan e and as work proceeds, additional requirements are derived and chan es may have to be made to the existin requirements. It is essential to mana e these additions and chan es efficiently andeffectively. To effectively analyze the impact of the chan es, it is necessary that the source of each requirement is known and the..

69%
   2008年上半年
   信息系统项目管..
   上午试卷 综合知识
第71题
选择题
The (71) is a eneral description of the architecture of a workflow mana ement system used by the WFMC, in which the main components and the associated interfaces are summarized. The workflow enactment service is the heart of a workflow system which consists of several (72).

49%
   2008年上半年
   信息系统项目管..
   上午试卷 综合知识
第57题
选择题
下表为同时开展的4个项目在某个时刻的计划值PV、实际成本AV和挣值EV,该时刻成本超出最多的项目和进度最为落后的项目分别是(57)。

40%
  示例说明:   选择     案例     论文        共30条     2/2页     上一页     下一页   




本网站所有产品设计(包括造型,颜色,图案,观感,文字,产品,内容),功能及其展示形式,均已受版权或产权保护。
任何公司及个人不得以任何方式复制部分或全部,违者将依法追究责任,特此声明。
本站部分内容来自互联网或由会员上传,版权归原作者所有。如有问题,请及时联系我们。


工作时间:9:00-20:00

客服

点击这里给我发消息 点击这里给我发消息 点击这里给我发消息

商务合作

点击这里给我发消息

客服邮箱service@rkpass.cn


京B2-20210865 | 京ICP备2020040059号-5 |京公网安备 11010502032051号 | 营业执照 | Copyright ©2000-2023 All Rights Reserved 软考在线版权所有