The project schedule is more than a document that lays out the activities over time to represent the time dimension of the project, it is a management tool to be used for decision making. As such , the schedule is used by the project management team to(73).
 
 
  A.  Measure, delay, record, distribute , analyze, and direct
 
  B.  Plan, schedule, monitor, control, report, and forecast
 
  C.  Promote, highlight, monitor, control, forecast, and report
 
  D.  Emphasize, visualize, analyze, conceptualize, report and record
 
 
 



↓第73题
  专业英语 知识点 更多相关真题:    更多>>  
 
  第73题    2016年上半年  
In project time management, activity definition is the process of identifying and documenting the specific action to be performed to produce the project deliverables. (73)are not..
  第72题    2010年下半年  
Most of the host operating system provides a way for a system administrator tomanually configure the IP information needed by a host.Automated configuration methods,such as (72),..
  第71题    2017年上半年  
( ) : The capability provided to the consumer is to use the provide's applications running on a c1oud infrastructure.The applications are accessible from various client devices thr..
 
题号导航      2011年下半年 系统集成项目管理工程师 上午试卷 综合知识   本试卷我的完整做题情况
第1题 /
第2题 /
第3题 /
第4题 /
第5题 /
第6题 /
第7题 /
第8题 /
第9题 /
第10题 /
第11题 /
第12题 /
第13题 /
第14题 /
第15题 /
 
第16题 /
第17题 /
第18题 /
第19题 /
第20题 /
第21题 /
第22题 /
第23题 /
第24题 /
第25题 /
第26题 /
第27题 /
第28题 /
第29题 /
第30题 /
 
第31题 /
第32题 /
第33题 /
第34题 /
第35题 /
第36题 /
第37题 /
第38题 /
第39题 /
第40题 /
第41题 /
第42题 /
第43题 /
第44题 /
第45题 /
 
第46题 /
第47题 /
第48题 /
第49题 /
第50题 /
第51题 /
第52题 /
第53题 /
第54题 /
第55题 /
第56题 /
第57题 /
第58题 /
第59题 /
第60题 /
 
第61题 /
第62题 /
第63题 /
第64题 /
第65题 /
第66题 /
第67题 /
第68题 /
第69题 /
第70题 /
第71题 /
第72题 /
第73题 /
第74题 /
第75题 /