免费智能真题库 > 历年试卷 > 系统集成项目管理工程师 > 2011年下半年 系统集成项目管理工程师 上午试卷 综合知识
第73题      2011年下半年 系统集成项目管理工程师 上午试卷 综合知识
所属知识点   专业英语       

 
The project schedule is more than a document that lays out the activities over time to represent the time dimension of the project, it is a management tool to be used for decision making. As such , the schedule is used by the project management team to(73).
 
 
  A.  Measure, delay, record, distribute , analyze, and direct
 
  B.  Plan, schedule, monitor, control, report, and forecast
 
  C.  Promote, highlight, monitor, control, forecast, and report
 
  D.  Emphasize, visualize, analyze, conceptualize, report and record
 
 
 

  专业英语 知识点 更多相关真题:    更多>  
 
  第71题    2014年上半年  
   70%
Information theory is related to the quantification of information. This was developed by Claude E. Shannon to who found fundamental limits on ( ) operations such as compressing da..
  第73题    2016年上半年  
   53%
In project time management, activity definition is the process of identifying and documenting the specific action to be performed to produce the project deliverables. (73)are not..
  第74题    2013年上半年  
   73%
All of followings should be done by the project manager during project control except ( 74 ).
 


 题号导航      2011年下半年 系统集成项目管理工程师 上午试卷 综合知识   本试卷我的完整做题情况 
1 /
2 /
3 /
4 /
5 /
6 /
7 /
8 /
9 /
10 /
11 /
12 /
13 /
14 /
15 /
 
16 /
17 /
18 /
19 /
20 /
21 /
22 /
23 /
24 /
25 /
26 /
27 /
28 /
29 /
30 /
 
31 /
32 /
33 /
34 /
35 /
36 /
37 /
38 /
39 /
40 /
41 /
42 /
43 /
44 /
45 /
 
46 /
47 /
48 /
49 /
50 /
51 /
52 /
53 /
54 /
55 /
56 /
57 /
58 /
59 /
60 /
 
61 /
62 /
63 /
64 /
65 /
66 /
67 /
68 /
69 /
70 /
71 /
72 /
73 /
74 /
75 /
 
↓第73题