全部科目 > 信息系统项目管理师 >
2013年下半年 上午试卷 综合知识
第 73 题
章/节 专业英语  
 
 
The uncertainty of an event is measured by its probability of occurrence and is inversely proportional to that. The more uncertain an event is. The more information is required to resolve uncertainty of that event. The amount of information is measured in (73).
 
  A.  possibility
 
  B.  bits
 
  C.  bps
 
  D.  probability




 
 
相关试题     专业英语 

  第73题    2009年上半年  
Many of the activities performed during the preliminary investigation are still being conducted in(71), but in much greater depth than before. Durin..

  第73题    2017年上半年  
The life cycle of a project is a description of the various phases of the project from the beginning to the end. One of the followings is not a phase ..

  第74题    2017年上半年  
Projects are a mean of achieving organizational ().




更多复习资料
请登录电脑版软考在线 www.rkpass.cn

京B2-20210865 | 京ICP备2020040059号-5
京公网安备 11010502032051号 | 营业执照
 Copyright ©2000-2025 All Rights Reserved
软考在线版权所有