全部科目 > 信息系统项目管理师 >
2009年上半年 上午试卷 综合知识
第 72 题
章/节 专业英语  
 
 
Many of the activities performed during the preliminary investigation are still being conducted in(71), but in much greater depth than before. During this phase, the analyst must become fully aware of the(72)and must develop enough knowledge about the(73)and the existing systems to enable an effective solution to be proposed and implemented.  Besides the(74)for process and data of current system, the deliverable from this phase also includes the(75)for the proposed system.
 
  A.  main symptom
 
  B.  root problem
 
  C.  final blueprint
 
  D.  data specification




 
 
相关试题     专业英语 

  第71题    2014年上半年  
All of the following are functions of CRM system except(71).

  第74题    2021年上半年  
The key benefit of the Project( )is that it determines whether to scquire goods and services from outside the project,if so,what to acquire as weII ..

  第71题    2018年上半年  
()is the technology that appears to emulate human performance typically by learning,coming to its own conclusions, appearing to understand complex c..




更多复习资料
请登录电脑版软考在线 www.rkpass.cn

京B2-20210865 | 京ICP备2020040059号-5
京公网安备 11010502032051号 | 营业执照
 Copyright ©2000-2025 All Rights Reserved
软考在线版权所有