全部科目 > 系统集成项目管理工程师 >
2017年下半年 上午试卷 综合知识
第 73 题
章/节 专业英语  
 
 
The seven basic quality tools are used within in the context of the PDCA Cycle to solve quality-related problems. These tools are used in( )in the following processes。
 
  A.  plan quality namagement
 
  B.  perform quality assurance
 
  C.  perform quality control
 
  D.  perform quality improvement




 
 
相关试题     专业英语 

  第74题    2011年上半年  
The earned value technique is a commonly used method of performance measurement. It integrates project scope, cost, and schedule measures to help the ..

  第73题    2019年下半年  
The( )is a graph that shows the relationship between two variables.

  第75题    2011年上半年  
SWOT analysis is a kind of risk identification method. If the project team chose the SO strategy, they should (75).




更多复习资料
请登录电脑版软考在线 www.rkpass.cn

京B2-20210865 | 京ICP备2020040059号-5
京公网安备 11010502032051号 | 营业执照
 Copyright ©2000-2025 All Rights Reserved
软考在线版权所有