全部科目 > 系统分析师 >
2013年上半年 上午试卷 综合知识
第 71 题
章/节 专业英语  
 
 
Feasibility should be measured throughout the life cycle of system development. The scope and complexity of an apparently feasible project can change after the initial problems and opportunities are fully analyzed or after the system has been designed. Thus, a project that is feasible at one point may become infeasible later. The first feasibility analysis is conducted during the (71) . The (72) represents a major feasibility analysis activity since it charts one of many possible implementations as the target for systems design. (73) is a measure of how well the solution will work in the organization. It is also a measure of how people feel about the system. When it is determined in the later stages of the system life cycle, (74) is often performed with a working prototype of the proposed system. This is a test of the system’s user interfaces and is measured in how easy they are to learn and to use and how they support the desired productivity levels of the users. Economic feasibility has been defined as a cost-benefit analysis. The (75) technique is a simple and popular method for determining if and when an investment will pay for itself.
 
  A.  problem analysis phase
 
  B.  preliminary investigation phase
 
  C.  requirements analysis phase
 
  D.  decision analysis phase




 
 
相关试题     专业英语 

  第71题    2016年上半年  
A variety of tools is available to help the analyst to discover the users' true needs. These tools are grouped into three broad techniques that are ba..

  第72题    2011年上半年  
The analysis phase answers the questions of who will use the system, what the system will do, and where and when it will be used. During this phase, t..

  第72题    2020年下半年  
Unified Modeling Language (UML) is a widely used method of visualizing and documenting an information system. The UML can be used to develop (71)




更多复习资料
请登录电脑版软考在线 www.rkpass.cn

京B2-20210865 | 京ICP备2020040059号-5
京公网安备 11010502032051号 | 营业执照
 Copyright ©2000-2025 All Rights Reserved
软考在线版权所有