During planning you sit down and estimate the time needed for each task and total them to come up with the project estimate. This duration is what you commit to complete the project. What is wrong with the scenario? ( ) .
 
  A.  The team did not create the estimate and estimating tales too long using that method
 
  B.  The team did not create the estimate and a network diagram was not used
 
  C.  The estimate is too long and should be created by management
 
  D.  The project estimate;should be the same as the customer's required completion date




 
 
相关试题     专业英语 

  第74题    2019年下半年  
When required,the Perform Integrated Change Control process includes a ( ),Which is a formally chartered group responsible for reviewing,evaluating,..

  第75题    2026年上半年  
When a process is in control, what do you want to do with the process?(75).

  第74题    2023年上半年  
Schedule control is concerned with all the followings except (74) .




更多复习资料
请登录电脑版软考在线 www.rkpass.cn

京B2-20210865 | 京ICP备2020040059号-5
京公网安备 11010502032051号 | 营业执照
 Copyright ©2000-2026 All Rights Reserved
软考在线版权所有