免费智能真题库 > 历年试卷 > 信息系统监理师 > 2018年下半年 信息系统监理师 上午试卷 综合知识
  第73题      
  章/节:   专业英语       

 
The organization shall undertake change in a planned and systematic manner, taking account of the review of the potential consequences of changes and taking action as necessary, to ensure the integrity of goods and services are maintained. This is called ( ).
 
 
  A.  control of changes
 
  B.  control of plans
 
  C.  control of accounts
 
  D.  control of service
 
 
 

  相关试题:专业英语          更多>  
 
  第75题    2017年上半年  
   77%
The difference value between Budgeted Cost for work Performed and Actual Cost for Work Performed is( ).
  第73题    2013年上半年  
   77%
Earned value analysis is an example of (73).
  第73题    2022年下半年  
   0%
A lOBaseT Ethernet LAN has (73).
   题号导航      2018年下半年 信息系统监理师 上午试卷 综合知识   本试卷我的完整做题情况  
1 /
2 /
3 /
4 /
5 /
6 /
7 /
8 /
9 /
10 /
11 /
12 /
13 /
14 /
15 /
 
16 /
17 /
18 /
19 /
20 /
21 /
22 /
23 /
24 /
25 /
26 /
27 /
28 /
29 /
30 /
 
31 /
32 /
33 /
34 /
35 /
36 /
37 /
38 /
39 /
40 /
41 /
42 /
43 /
44 /
45 /
 
46 /
47 /
48 /
49 /
50 /
51 /
52 /
53 /
54 /
55 /
56 /
57 /
58 /
59 /
60 /
 
61 /
62 /
63 /
64 /
65 /
66 /
67 /
68 /
69 /
70 /
71 /
72 /
73 /
74 /
75 /
 
第73题    在手机中做本题