  第74题      
  章/节:   专业英语       

 
When required,the Perform Integrated Change Control process includes a ( ),Which is a formally chartered group responsible for reviewing,evaluating,approving, deferring, or rejecting changes to the project and for recording and communicating such decisions.
 
 
  A.  BBC
 
  B.  CCB
 
  C.  BCB
 
  D.  CBC
 
 
 

  相关试题:专业英语          更多>  
 
  第74题    2010年下半年  
   57%
Changes often happen in (74).
  第75题    2013年下半年  
   50%
With a clear SOW a contractor completes work as specified, but the buyer is not pleased with the result. The contract is..
  第74题    2017年下半年  
   74%
Change control within information technology ( IT ) systems is a formal process used to ensure that changes to product..
   题号导航      2019年下半年 信息系统监理师 上午试卷 综合知识   本试卷我的完整做题情况  
1 /
2 /
3 /
4 /
5 /
6 /
7 /
8 /
9 /
10 /
11 /
12 /
13 /
14 /
15 /
 
16 /
17 /
18 /
19 /
20 /
21 /
22 /
23 /
24 /
25 /
26 /
27 /
28 /
29 /
30 /
 
31 /
32 /
33 /
34 /
35 /
36 /
37 /
38 /
39 /
40 /
41 /
42 /
43 /
44 /
45 /
 
46 /
47 /
48 /
49 /
50 /
51 /
52 /
53 /
54 /
55 /
56 /
57 /
58 /
59 /
60 /
 
61 /
62 /
63 /
64 /
65 /
66 /
67 /
68 /
69 /
70 /
71 /
72 /
73 /
74 /
75 /
 
第74题    在手机中做本题