免费智能真题库 > 历年试卷 > 系统分析师 > 2009年上半年 系统分析师 上午试卷 综合知识
  第75题      
  章/节:   专业英语       

 
Many of the activities performed during the preliminary investigation are still being conducted in (71).but in much greater depth than before. During this phase, the analyst must become fully aware of the(72)and must develop enough knowledge about the(73)and the existing systems to. enable an effective solution to be proposed and implemented. Besides the(74)for process and data of current system,the deliverable from this phase also includes the(75)for the proposed system.
 
 
  A.  hardware and software specification
 
  B.  system performance specification
 
  C.  formal requirements definition
 
  D.  general problem statement
 
 
 

 
  第75题    2010年上半年  
   70%
System analysis is traditionally done top-down using structured analysis based on(71).Object-oriented analysis focuses o..
  第71题    2015年上半年  
   55%
A requirement is simply a statement of what the system must do or what characteristics it needs to have. Requirements ev..
  第73题    2017年上半年  
   62%
The purpose of systems analysis phase is to build a logical model of the new system. The first step is71, where you inve..
   题号导航      2009年上半年 系统分析师 上午试卷 综合知识   本试卷我的完整做题情况  
1 /
2 /
3 /
4 /
5 /
6 /
7 /
8 /
9 /
10 /
11 /
12 /
13 /
14 /
15 /
 
16 /
17 /
18 /
19 /
20 /
21 /
22 /
23 /
24 /
25 /
26 /
27 /
28 /
29 /
30 /
 
31 /
32 /
33 /
34 /
35 /
36 /
37 /
38 /
39 /
40 /
41 /
42 /
43 /
44 /
45 /
 
46 /
47 /
48 /
49 /
50 /
51 /
52 /
53 /
54 /
55 /
56 /
57 /
58 /
59 /
60 /
 
61 /
62 /
63 /
64 /
65 /
66 /
67 /
68 /
69 /
70 /
71 /
72 /
73 /
74 /
75 /
 
第75题    在手机中做本题