免费智能真题库 > 历年试卷 > 信息系统监理师 > 2011年上半年 信息系统监理师 上午试卷 综合知识
  第75题      
  章/节:   专业英语       

 
Which statement about the preliminary design stage of a software development project is true? (75)。
 
 
  A.  The preliminary design is an internal document used only by programmers
 
  B.  The preliminary design is the result of mapping product requirements into software and hardware functions
 
  C.  The preliminary design of the product comes from the requirement specification
 
  D.  The developers produce the preliminary design by defining the software structure in enough detail to permit coding
 
 
 

 
  第73题    2014年上半年  
   63%
”Cost of quality ”is a project management concept that includes cost of ( ).
  第75题    2015年上半年  
   72%
(75)is the application of planned, systematic quality activities to ensure that the project will employ all processes ..
  第72题    2012年下半年  
   67%
Supervision will manage the implementation and the configuration of the different types of project documents, not includ..
   题号导航      2011年上半年 信息系统监理师 上午试卷 综合知识   本试卷我的完整做题情况  
1 /
2 /
3 /
4 /
5 /
6 /
7 /
8 /
9 /
10 /
11 /
12 /
13 /
14 /
15 /
 
16 /
17 /
18 /
19 /
20 /
21 /
22 /
23 /
24 /
25 /
26 /
27 /
28 /
29 /
30 /
 
31 /
32 /
33 /
34 /
35 /
36 /
37 /
38 /
39 /
40 /
41 /
42 /
43 /
44 /
45 /
 
46 /
47 /
48 /
49 /
50 /
51 /
52 /
53 /
54 /
55 /
56 /
57 /
58 /
59 /
60 /
 
61 /
62 /
63 /
64 /
65 /
66 /
67 /
68 /
69 /
70 /
71 /
72 /
73 /
74 /
75 /
 
第75题    在手机中做本题