Many of the activities performed during the preliminary investigation are still being conducted in(71), but in much greater depth than before. During this phase, the analyst must become fully aware of the(72)and must develop enough knowledge about the(73)and the existing systems to enable an effective solution to be proposed and implemented.  Besides the(74)for process and data of current system, the deliverable from this phase also includes the(75)for the proposed system.
 
  A.  hardware environment
 
  B.  testing environment
 
  C.  software environment
 
  D.  business environment




 
 
相关试题     专业英语 

  第74题    2016年下半年  
Quality management ensures that an organization,product or service is (73)。It has four main components:quality planning,quality assurance,quality c..

  第72题    2022年上半年  
()is a grid that shows the project resources assigned to each work package.

  第73题    2011年下半年  
In the process of communication requirement analysis, the project manager should consider the number of potential communication channels or paths as a..