2009年上半年 上午试卷 综合知识
第 74 题
章/节 专业英语  
 
 
Many of the activities performed during the preliminary investigation are still being conducted in(71), but in much greater depth than before. During this phase, the analyst must become fully aware of the(72)and must develop enough knowledge about the(73)and the existing systems to enable an effective solution to be proposed and implemented.  Besides the(74)for process and data of current system, the deliverable from this phase also includes the(75)for the proposed system.
 
  A.  logical models
 
  B.  physical models
 
  C.  design models
 
  D.  implementation models




 
 
相关试题     专业英语 

  第71题    2020年下半年  
The patterns of()show the next probable behavior of a person or market without a logical explanation as to why.

  第75题    2018年下半年  
( ) is a technique for estimating the duration or cost of an activity or a project using historical data from a similar activity or project.

  第71题    2016年下半年  
(71)promises to streamline the on-demand provisioning of software,data as a service, achieving economies of scale in IT solutions deployment and ope..




更多复习资料
请登录电脑版软考在线 www.rkpass.cn

京B2-20210865 | 京ICP备2020040059号-5
京公网安备 11010502032051号 | 营业执照
 Copyright ©2000-2026 All Rights Reserved
软考在线版权所有