Many of the activities performed during the preliminary investigation are still being conducted in(71), but in much greater depth than before. During this phase, the analyst must become fully aware of the(72)and must develop enough knowledge about the(73)and the existing systems to enable an effective solution to be proposed and implemented.  Besides the(74)for process and data of current system, the deliverable from this phase also includes the(75)for the proposed system.
 
  A.  logical models
 
  B.  physical models
 
  C.  design models
 
  D.  implementation models




 
 
相关试题     专业英语 

  第72题    2018年下半年  
Hige-profile example of ()include autonomous vehicles(such as drones and self-driving cars),Creating art(such as poetry) and online assistants(Such ..

  第73题    2008年下半年  
The Estimate Activity Resource process is closely coordinated with the (73)process.

  第75题    2009年下半年  
The creation of a work breakdown structure(WBS)is the process of(75)the major project deliverables.