2009年上半年 上午试卷 综合知识
第 75 题
章/节 专业英语  
 
 
Many of the activities performed during the preliminary investigation are still being conducted in(71), but in much greater depth than before. During this phase, the analyst must become fully aware of the(72)and must develop enough knowledge about the(73)and the existing systems to enable an effective solution to be proposed and implemented.  Besides the(74)for process and data of current system, the deliverable from this phase also includes the(75)for the proposed system.
 
  A.  hardware and software specification
 
  B.  system performance specification
 
  C.  formal requirements definition
 
  D.  general problem statement




 
 
相关试题     专业英语 

  第72题    2012年下半年  
A data warehouse is a subject-oriented data set used for reporting and analusis. Data warehouses can be subdivided into( 72). Which store subsets of d..

  第73题    2012年上半年  
An example of scope verification is (73).

  第74题    2025年上半年  
Project selection methods involve measuring value or attractiveness to the project owner or sponsor and may include other organizational decision crit..