2009年上半年 上午试卷 综合知识
第 75 题
章/节 专业英语  
 
 
Many of the activities performed during the preliminary investigation are still being conducted in(71), but in much greater depth than before. During this phase, the analyst must become fully aware of the(72)and must develop enough knowledge about the(73)and the existing systems to enable an effective solution to be proposed and implemented.  Besides the(74)for process and data of current system, the deliverable from this phase also includes the(75)for the proposed system.
 
  A.  hardware and software specification
 
  B.  system performance specification
 
  C.  formal requirements definition
 
  D.  general problem statement




 
 
相关试题     专业英语 

  第71题    2008年下半年  
Define Activities is the process of identifying the specific actions to be performed to produce the (71).

  第75题    2012年上半年  
You have just taken control of a project in the middle of execution and need to learn who has approva lauthority for revisions in scope. (75) document..

  第71题    2008年上半年  
The (71) is a eneral description of the architecture of a workflow mana ement system used by the WFMC, in which the main components and the associat..