Many of the activities performed during the preliminary investigation are still being conducted in(71), but in much greater depth than before. During this phase, the analyst must become fully aware of the(72)and must develop enough knowledge about the(73)and the existing systems to enable an effective solution to be proposed and implemented.  Besides the(74)for process and data of current system, the deliverable from this phase also includes the(75)for the proposed system.
 
 
  A.  logical models
 
  B.  physical models
 
  C.  design models
 
  D.  implementation models
 
 
 

  相关试题:专业英语          更多>  
 
  第75题    2018年下半年  
   63%
( ) is a technique for estimating the duration or cost of an activity or a project using historical data from a similar ..
  第73题    2021年下半年  
   60%
()the process of determing documenting and managing stakeholder needs and requirements to meet project objectives.
  第73题    2018年上半年  
   40%
( )includes the processes required to ensure that the project includes all the work required , and only the work requi..
   题号导航      2009年上半年 信息系统项目管理师 上午试卷 综合知识   本试卷我的完整做题情况  
1 /
2 /
3 /
4 /
5 /
6 /
7 /
8 /
9 /
10 /
11 /
12 /
13 /
14 /
15 /
 
16 /
17 /
18 /
19 /
20 /
21 /
22 /
23 /
24 /
25 /
26 /
27 /
28 /
29 /
30 /
 
31 /
32 /
33 /
34 /
35 /
36 /
37 /
38 /
39 /
40 /
41 /
42 /
43 /
44 /
45 /
 
46 /
47 /
48 /
49 /
50 /
51 /
52 /
53 /
54 /
55 /
56 /
57 /
58 /
59 /
60 /
 
61 /
62 /
63 /
64 /
65 /
66 /
67 /
68 /
69 /
70 /
71 /
72 /
73 /
74 /
75 /
 
第74题    在手机中做本题