免费智能真题库 > 历年试卷 > 信息系统项目管理师 > 2009年上半年 信息系统项目管理师 上午试卷 综合知识
  第74题      
  章/节:   专业英语       

 
Many of the activities performed during the preliminary investigation are still being conducted in(71), but in much greater depth than before. During this phase, the analyst must become fully aware of the(72)and must develop enough knowledge about the(73)and the existing systems to enable an effective solution to be proposed and implemented.  Besides the(74)for process and data of current system, the deliverable from this phase also includes the(75)for the proposed system.
 
 
  A.  logical models
 
  B.  physical models
 
  C.  design models
 
  D.  implementation models
 
 
 

  相关试题:专业英语          更多>  
 
  第75题    2008年下半年  
   67%
Developing the project schedule is often an iterative process. It determines the planned start and finish dates for proj..
  第72题    2016年上半年  
   60%
(72):a method of obtaining early feedback on requirements by providing a working model of the expected product before..
  第75题    2011年上半年  
   44%
Precedence Diagramming Method(PDM) is a method used in activity sequencing.There are four types of dependencies or prece..
   题号导航      2009年上半年 信息系统项目管理师 上午试卷 综合知识   本试卷我的完整做题情况  
1 /
2 /
3 /
4 /
5 /
6 /
7 /
8 /
9 /
10 /
11 /
12 /
13 /
14 /
15 /
 
16 /
17 /
18 /
19 /
20 /
21 /
22 /
23 /
24 /
25 /
26 /
27 /
28 /
29 /
30 /
 
31 /
32 /
33 /
34 /
35 /
36 /
37 /
38 /
39 /
40 /
41 /
42 /
43 /
44 /
45 /
 
46 /
47 /
48 /
49 /
50 /
51 /
52 /
53 /
54 /
55 /
56 /
57 /
58 /
59 /
60 /
 
61 /
62 /
63 /
64 /
65 /
66 /
67 /
68 /
69 /
70 /
71 /
72 /
73 /
74 /
75 /
 
第74题    在手机中做本题