免费智能真题库 > 历年试卷 > 信息系统项目管理师 > 2009年上半年 信息系统项目管理师 上午试卷 综合知识
  第75题      
  章/节:   专业英语       

 
Many of the activities performed during the preliminary investigation are still being conducted in(71), but in much greater depth than before. During this phase, the analyst must become fully aware of the(72)and must develop enough knowledge about the(73)and the existing systems to enable an effective solution to be proposed and implemented.  Besides the(74)for process and data of current system, the deliverable from this phase also includes the(75)for the proposed system.
 
 
  A.  hardware and software specification
 
  B.  system performance specification
 
  C.  formal requirements definition
 
  D.  general problem statement
 
 
 

  相关试题:专业英语          更多>  
 
  第71题    2018年上半年  
   43%
()is the technology that appears to emulate human performance typically by learning,coming to its own conclusions, app..
  第72题    2022年下半年  
   51%
()can be described by the following characteristics: volume, variety,velocity,veracity and value.?
  第73题    2016年上半年  
   60%
The scope management plan is how the team will prepare the(73)a document that includes descriptions of create the WBS,..
   题号导航      2009年上半年 信息系统项目管理师 上午试卷 综合知识   本试卷我的完整做题情况  
1 /
2 /
3 /
4 /
5 /
6 /
7 /
8 /
9 /
10 /
11 /
12 /
13 /
14 /
15 /
 
16 /
17 /
18 /
19 /
20 /
21 /
22 /
23 /
24 /
25 /
26 /
27 /
28 /
29 /
30 /
 
31 /
32 /
33 /
34 /
35 /
36 /
37 /
38 /
39 /
40 /
41 /
42 /
43 /
44 /
45 /
 
46 /
47 /
48 /
49 /
50 /
51 /
52 /
53 /
54 /
55 /
56 /
57 /
58 /
59 /
60 /
 
61 /
62 /
63 /
64 /
65 /
66 /
67 /
68 /
69 /
70 /
71 /
72 /
73 /
74 /
75 /
 
第75题    在手机中做本题