A project manager believes that modifying the scope of the project may provide added value service for the customer. The project manager should(75).
 
 
  A.  assign change tasks to project members
 
  B.  call a meeting of the configuration control board
 
  C.  change the scope baseline
 
  D.  postpone the modification until a separate enhancement project is funded after this project is completed according to the original baseline
 
 
 

  相关试题:专业英语          更多>  
 
  第72题    2025年下半年  
   0%
The IoT architecture can be divided into three layers. ( )is the key layer to realize the foundational capabilities wh..
  第74题    2013年上半年  
   59%
All of followings should be done by the project manager during project control except ( 74 ).
  第71题    2012年上半年  
   69%
A(71)is a dedicated storage network that provides access to consolidated,block level storage.It is primarily used to mar..
   题号导航      2010年上半年 系统集成项目管理工程师 上午试卷 综合知识   本试卷我的完整做题情况  
1 /
2 /
3 /
4 /
5 /
6 /
7 /
8 /
9 /
10 /
11 /
12 /
13 /
14 /
15 /
 
16 /
17 /
18 /
19 /
20 /
21 /
22 /
23 /
24 /
25 /
26 /
27 /
28 /
29 /
30 /
 
31 /
32 /
33 /
34 /
35 /
36 /
37 /
38 /
39 /
40 /
41 /
42 /
43 /
44 /
45 /
 
46 /
47 /
48 /
49 /
50 /
51 /
52 /
53 /
54 /
55 /
56 /
57 /
58 /
59 /
60 /
 
61 /
62 /
63 /
64 /
65 /
66 /
67 /
68 /
69 /
70 /
71 /
72 /
73 /
74 /
75 /
 
第75题    在手机中做本题